The Overnight Supply Line
A braided supply line under a second-floor bathroom sink lets go at 2am. By morning, water has traveled down through the ceiling into the kitchen and out along the subfloor. We extract, pull the wet ceiling and cabinet toe-kicks, set drying equipment to a calculated load, and monitor daily until the structure hits target. Then we rebuild the ceiling, cabinetry and flooring.